![]() ![]() Created as an initiative of the West Virginia Legislature, the new trail represents a unique partnership between West Virginia’s State Parks and the Hatfield-McCoy Trails.Ĭabwaylingo State Forest sits on nearly 8,300 acres of land in southern West Virginia. The Cabwaylingo Trail is the first in Hatfield-McCoy Trail System to be located within a state forest. Beginning March 1, 2021, the Hatfield-McCoy Trail System will welcome riders to it’s newest attractions – the Cabwaylingo and Ivy Branch Trail Systems. Please contact our office if you need assistance.CHARLESTON, W.Va. Insurance must name Ohno, the project Owner and any other parties so designated as additionally insured and be in the types and amounts required by the specifications. ![]() The surety must be a Washington admitted surety. Ohno will reimburse the bond premium at actual cost not to exceed 2 percent. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. Any and all bids may be rejected at the sole discretion of Ohno Construction. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. Inconsistent bid terms and conditions shall be void. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Please contact the Estimating Department for any questions.īy submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote. All takeoff quantities provided by Ohno are for your convenience only. However, Ohno is not responsible for the accuracy of the supplied bid documents. ![]() Ohno makes its best attempt to provide subcontractors with the most complete and current project information for bidding purposes. To access these documents:īid documents are provided for your reference only. Please note to manually type in the information. Proposals received after the Bid Due Date and Time will NOT be considered.īid documents are available for download from our website. Quotes are required at least 2 hours prior to bid time. ![]() Proposals may be emailed to or faxed to 20. Please refer to City of Covington’s website for all current COVID-19 Guidelines.īID DUE DATE & TIME: Wednesday, May 17 end of business day This project is subject to prevailing wages. RFI: Submit no later than at end of business day Project Schedule: 120 calendar days from NTP Location: 17081 SE Wax Road, Covington WA 98042Ī/E Estimate: $900,000 to $1,100,000 including all Additive AlternatesĪdditive Alternate1: Refer to drawing plans for limitsĪdditive Alternate 2: Refer to drawing plans for limits Ohno Construction invites your firm to submit a bid for the following project:Ĭonstruction includes of site improvements as parking, cement concrete sidewalk, trails, a new pedestrian crosswalk at SE Wax Road, furnishings, lighting, permanent signage, park entrance sign, landscape planting, irrigation and other associated work. ![]()
0 Comments
Leave a Reply. |